Tuesday, May 13, 2008

Machine Gun Kelly

I headed out bright and early to find a replacement hose for the cutter. I went to several hydraulic supply stores and came up empty, finally finding Royal Brass & Hose on Baseline Rd. It took about an hour for them to fabricate a new hose with new fittings. With replacement parts in hand I headed back to the print shop. Mark was arriving about then and we put the whole back together. Of course I had to head out and get some hydraulic fluid and while I was at the hardware store I decided to get 6 feet of rubber tubbing to extend our shop's indoor air conditioner's drain (the supplied hose was only 1 foot long and not able to reach anywhere, so in typical Arkansas fashion we jerry rigged a garden hose to it). After clamping that on and putting a fresh batch of fluid in the cutter we were back in business. Mark commenced to work and I did some shrink wrapping. The heating element promptly burned out and that machine went down. We had spare parts for it and after a bit had it running again.

This consumed much of my writing time of course and I pushed back to tomorrow what I wanted to do today. But we did manage to put to bed two outside projects and get Dro Mandras off to the Impressions warehouse in Ft. Wayne. The cover on that book looks great, a deep green to draw out the colors in the picture Peter Bradley drew for it. Great stuff by Casey and Peter.

Tomorrow we have some major shipping to do, the last of the Free RPG Day material goes out as well as one large outside job. Once that is in the bag I'm back in the office to catch up on email and writing. Things should lighten up and I fully expect the next couple of weeks to be very C&C productive.

Thanks for playing.
Steve

No comments:

Plywood Memories from Gencon to Vegas

  Out trip to Gencon took us up through the Arkansas Delta country, and into the boot of Missouri, across the Big Muddy and on into the spra...